Conversion of Irrigation Development Corporations (IDCs)
into
River Basin Agencies (RBAs)
(Refer: MWRRA Act, 2005)
Who will prepare (ISWP)?
Section 15(3): The (State Water) Board shall prepare a draft
Integrated State Water Plan (ISWP) on the basis of basin and sub-basin wise
water plans prepared and submitted by the River Basin Agencies (RBAs)
Where
are the RBAs?
MWRRA
Act has taken a short cut.
As
per Section 2(2) (u) existing Irrigation Development Corporations (IDC) are only the River Basin Agencies (RBAs)
IDCs
cannot be the RBAs in the truest sense of the term
Conversion
of IDCs into RBAs is a must.
What
is the difference between IDCs & RBAs?
Back
to basics:
IDCs
|
RBAs
|
Mono-disciplinary
(only Civil Engineers)
Emphasis
on
- Project-wise development (i.e. only construction),
- Surface water,
-
Irrigation & Hydropower
(
Water Management with W R D)
|
Inter-disciplinary
( representation to all categories of water users)
Emphasis
on
- Integrated river basin/ sub basin-wise development & management
-
Surface & ground water
-
Irrigation & Non-Irrigation
-
Permission to water use & issuance of water entitlements u/s 14
|
RBAs
– an accepted principle!
State
Water Policy envisages RBAs
MWRRA
Act provides for RBAs
Mahrashtra
Krisna River Basin agency (MKRBA) bill already prepared by WRD but
the same is not being processed
GR
on Restructuring of WRD lay emphasis on RBAs
SIT
(Chitale committee) recommends RBAs
RBAs
& ISWP together form the strategy of Reforms
Process
– details!
RBAs
(total 5) to prepare Integrated basin / sub basinwise water plans including proposed Action Plans
Complete
Stakeholder Consultation;
Get
plan vetted by MWRRA;
Revise
water plan if required;
Submit
plan to WRD
WRD
to submit 5 plans to SWB
SWB
to prepare one ISWP by integrating 5 plans
SWB
to submit draft ISWP to State Water Council for approval
MWRRA
to clear projects included in ISWP &
resolve water conflicts with reference to ISWP
No comments: